LC120 & LC200 Pile Sleeves

Prefabricated in a Houston, Texas factory, LC120 & LC200 HDPE Pile Sleeves SuperSleeve™ can be made in both black and light gray, round or square with a lead time of approximately 2-3 weeks. These pile sleeves can be made to fit any consistent size OD pile, whether it is steel, fiberglass or concrete, with approximately +1/16” clearance, and multiple lengths are available. LC120 and LC200 are 0.120″ and 0.200″ thick, respectively.

Made from virgin high density polyethylene, the pile sleeves are ready to slide down the pile for final assembly (hardware not included). The sleeves can be turned to get better surface area over time or can be flipped from bottom to top. There are many benefits offered by these pile sleeves such as abrasion, rubbing and corrosion resistance, better aesthetics, ease of installation and low maintenance with a long service life.

Now Available – The LC120 & LC200 HDPE Pile Sleeves “Fuse Welded” to the PE Top Caps, (Flat or Cone Type) at our factory. This eliminates attachment steel hardware, which will rust over time, thus caps will fall off. Shipped for fast and easy installation. Lead Time @ 2-4 weeks.

Panama Cruise and Container Terminals

PANAMA CRUISEAND CONTAINERTERMINALS The Project Panama Cruise and Container Terminals Close to Panama City a new Cruise Terminal was built in Amador with an eye to serving as a port of call and potentially as a home port for cruise vessels. Panama aims to increase access for cruise ships to Panama City to facilitate tourism. […]

Continue reading

Turkmenbashi International Seaport

TURKMENBASHIINTERNATIONALSEAPORT The Project Turkmenbashi Intl. Seaport In 2016 we were awarded with the supply of fender systems for the entire new port of Turkmenistan’s Turkmenbashi International Seaport, on the east coast of the Caspian Sea. Our client, the Turkish construction company GAP Insaat led the 1.5 billion USD project. Turkmenbashi International Seaport is now the […]

Continue reading

Statue of Liberty Dock Rehabilitation

STATUE OF LIBERTYDOCK REHABILITATION The Project Statue of Liberty Dock Hurricane Sandy devastated the east coast, in October of 2012. Liberty Island was one of the locations directly hit, causing extreme damage to the Statue of Liberty visitor and service docks. During the first phase of the recovery project, more than 200 timber piles needed […]

Continue reading

Laurence Harbor Wastewater Facility

LAURENCE HARBORWASTEWATERFACILITY The Project Laurence Harbor The Old Bridge Municipal Utilities Authority, located on Raritan Bay needed to protect the Laurence Harbor Wastewater Facility from future storm surge. Fiberglass seawalls and fiberglass walers were selected to help accomplish this task. The project included driving 2 separate sheet pile walls as part of the 700 linear […]

Continue reading

Craney Island Fuel Terminal

US NAVY CRANEY ISLAND FUEL TERMINAL The Project Craney Island Fuel Terminal Lee Composites supplied eleven 16” diameter FRP marine pilings 95’ long for the Center Mooring Fender, which is part of the US Navy Fuel Pier D replacement, at the Craney Island Fuel Terminal in Portsmouth, Virginia. A 4” filament wound collar was added […]

Continue reading

US Navy San Diego

US NAVY SAN DIEGO PIER 12 & BASE POINT LOMA The Project US Navy San Diego Lee Composites supplied products for two projects in San Diego for the US Navy: Pier 12 and the Fuel Pier at Base Point Loma. We supplied 230 12” diameter fiberglass pilings from 61 ft. to 66 ft. in length […]

Continue reading

Long Beach Boardwalk Replacement

LONGBEACHBOARDWALKREPLACEMENT our portfolio Long Beach NY Boardwalk The Long Beach Boardwalk was severely damaged in October of 2012 during Hurricane Sandy. The severity of the damage forced the 2.5 mile boardwalk to be replaced. Lee Composites supplied over 6,600 pieces of fiberglass sheet pile in 20’ lengths. The sheet pile was used as a retaining […]

Continue reading

Masonboro Harbor

MASONBOROHARBOR The Project Masonboro Harbor Approximately 900 linear feet of seawall using  Heavy Duty Fiberglass Composite Sheet Pile, Fiberglass Waler, Composite Top Cap, Manta Ray earth anchors, Blue Marlin weep hole filters, and Plastic Hex Bolts/Nuts. Work with us project owner Masonboro Harbor Drive HOA project sector Residential Date of Completion September 2002 location Wilmington, […]

Continue reading