Long Beach NY Boardwalk

The Long Beach Boardwalk was severely damaged in October of 2012 during Hurricane Sandy. The severity of the damage forced the 2.5 mile boardwalk to be replaced. Lee Composites supplied over 6,600 pieces of fiberglass sheet pile in 20’ lengths. The sheet pile was used as a retaining wall to help protect the boardwalk from future devastating storms.

Work with us

project owner

City of Long Beach, NY

project sector

Public Infrastructure

Date of Completion

August 2013

location

Long Island, NY

Status

Completed

Lee Composites had to meet a very tight schedule, to keep contractors on pace, since the seawall was the first part of the project. Lee Composites shipped the 1st of 23 truckloads in early May 2013 and completed shipment by the end of July.

The Products

Products Used in this Project

What the Project Contractor Says

The Long Beach Boardwalk repair project was a fast paced project, with a lot of scrutiny from the public in anticipation of completion. Lee Composites provided the fiberglass pile sheets to spec and on time. The staff of Lee Composites were able to stay ahead of Peter Scalamandre & Sons, Inc. Even as our production increased beyond the original projected commitments.

Lee Composites was always accessible and provided clear and accurate information. One of the best material suppliers that I have been involved with in my career. The ability of Lee Composites to provide the material in a timely and balanced manner set the pace for Peter Scalamandre & Sons, Inc. and all those that followed behind on this project.
Robert Hutzler

Peter Scalamandre & Sons