Dolphin Navigational Clusters, Brazos River

Dolphin Navigational Clusters TXDOT SH36 at Brazos River The Project Dolphin Navigational Clusters TXDOT SH36 at Brazos River Lee Composites supplied products to Orion Marine Construction for the Dolphin Navigational Clusters as part of TXDOT SH36 at Brazos River. We supplied 76 12” diameter fiberglass pilings and our LC120 HDPE Pile Sleeves SuperSleeve™ with fuse […]

Continue reading

Statue of Liberty Dock Rehabilitation

STATUE OF LIBERTYDOCK REHABILITATION The Project Statue of Liberty Dock Hurricane Sandy devastated the east coast, in October of 2012. Liberty Island was one of the locations directly hit, causing extreme damage to the Statue of Liberty visitor and service docks. During the first phase of the recovery project, more than 200 timber piles needed […]

Continue reading

Craney Island Fuel Terminal

US NAVY CRANEY ISLAND FUEL TERMINAL The Project Craney Island Fuel Terminal Lee Composites supplied eleven 16” diameter FRP marine pilings 95’ long for the Center Mooring Fender, which is part of the US Navy Fuel Pier D replacement, at the Craney Island Fuel Terminal in Portsmouth, Virginia. A 4” filament wound collar was added […]

Continue reading

US Navy San Diego

US NAVY SAN DIEGO PIER 12 & BASE POINT LOMA The Project US Navy San Diego Lee Composites supplied products for two projects in San Diego for the US Navy: Pier 12 and the Fuel Pier at Base Point Loma. We supplied 230 12” diameter fiberglass pilings from 61 ft. to 66 ft. in length […]

Continue reading