Skip to content

Dolphin Navigational Clusters TXDOT SH36 at Brazos River

The Project

Dolphin Navigational Clusters TXDOT SH36 at Brazos River

Lee Composites supplied products to Orion Marine Construction for the Dolphin Navigational Clusters as part of TXDOT SH36 at Brazos River. We supplied 76 12ā€ diameter fiberglass pilings and our LC120 HDPE Pile Sleeves SuperSleeveā„¢ with fuse welded PE Flat Top Caps for Dolphin Navigational Clusters on the Brazos river in Houston, TX. The four clusters are composed of 19 piles and pile sleeves.

Work with us

project owner

TXDOT

project sector

Infrastructure

Date of Completion

May 2023

location

Houston, TX

Status

Completed

The Products

Products Used in this Project