Statue of Liberty Dock Rehabilitation

STATUE OF LIBERTYDOCK REHABILITATION The Project Statue of Liberty Dock Hurricane Sandy devastated the east coast, in October of 2012. Liberty Island was one of the locations directly hit, causing extreme damage to the Statue of Liberty visitor and service docks. During the first phase of the recovery project, more than 200 timber piles needed […]

Continue reading

Craney Island Fuel Terminal

US NAVYCRANEY ISLANDFUEL TERMINAL The Project Craney Island Fuel Terminal Lee Composites supplied eleven 16” diameter SuperPiles™ 95’ long for the Center Mooring Fender, which is part of the US Navy Fuel Pier D replacement, at the Craney Island Fuel Terminal in Portsmouth, Virginia. A 4” filament wound collar was added to the pile as […]

Continue reading

US Navy San Diego

US NAVYSAN DIEGO PIER 12& BASE POINT LOMA The Project US Navy San Diego Lee Composites Supplied Products for two projects in San Diego for the US Navy: Pier 12 and the Fuel Pier at Base Point Loma. We supplied 230 12” diameter SuperPiles™ from 61 ft. to 66 ft. in length for the new […]

Continue reading